Things You Will Need
Assembly time, approximately 10 minutes. Difficulty: Easy.
STEP 1:
With Stem face plate removed, install bar.
STEP 2:
Install Top bar clamp and bolts, tighten bolts to stem body until there is no gap between the stem body and face clamps.
STEP 3:
Thread lower bolts until bar is held in place, but can still roll easily.
STEP 4:
Find the corresponding marking to your frames headangle and line it up with the edge of the stem face plate.
If you are using a non-OneUp stem, you can also line up the markings with the edge of the stem face plate.
STEP 5:
Torque all stem bolts to 6Nm.
Note: It is highly recommended to check the torque spec twice before shredding!
Exclusive discounts and new product news